Welcome to my Management Notes
MBA Notes
Principals of Managemet
By
Jamal Panhwar
As taught by Prof: Feroz Alam
at the Preston University Karachi Pakistan
References from the Book written by
Index
Definition of Management
Management in all business areas and organizational activities are the acts of getting people together to accomplish desired goals and objectives efficiently and effectively. Management comprises planning, organizing, staffing, leading or directing, and controlling an organization (a group of one or more people or entities) or effort for the purpose of accomplishing a goal. Resourcing encompasses the deployment and manipulation of human resources, financial resources, technological resources, and natural resources.
Because organizations can be viewed as systems, management can also be defined as human action, including design, to facilitate the production of useful outcomes from a system. This view opens the opportunity to 'manage' oneself, a pre-requisite to attempting to manage others.
Management can also refer to the person or people who perform the act(s) of management.. … http://en.wikipedia.org/wiki/Management
There can be many definitions of management but most managers agree that "Management is an organized effort of people whose purpose is to achieve the objectives and goals of an organization." Management is not that simple either. To gain a better understanding of management, let’s review the ideas and views expressed by academicians and practitioners of Management.
Management as a “Process”:
McFardland defines management as “A process by which managers create, direct, maintain and operate purposive organization through systematic, coordinated, co-operative human efforts”.
An important tern in this definition is “Process”. This term
emphasis the dynamic or on going nature of management, an activity over
varying span of time. The dynamic nature implies that change is reality of
organizational life. In managing organizations, managers create changes adopt
organizations to changes
and implement changes successfully in their organizations. Businesses fail and
become bankrupt because managers fail in their attempt to cope with the change.
Management as “coordination”:
Donally, Gibson and Ivancevich also support the view of management as a process but their stress in more on co-ordination. According to them, “Management is a process by which individual and group effort is coordinated towards group goals”. In order to achieve goals, coordination is essential and management involves securing and maintaining this coordination.
This coordination effort is also stressed in the definition of Koontz and O’Donnell. According to them, “Management is a process of designing and maintaining an environment in which, individuals, working together in groups efficiently and effectively accomplish group goals”.
Management as a “Function”:
There are those who view management as a function rather than a process. Dunn, Stephens and Kelly contend that “Management is a role which includes a set of duties, responsibilities, and relationships-involved in work organizations”. These duties and responsibilities constitute the function a manager performs. The duties and responsibilities a manager performs are quite different from those performed by managerial employees.
Management is getting things done through other people:
A simple definition of management that is often quoted and it
sounds very simple. According to this definition, managers do not do
things they get other people to do things. If managing is an individual ability
to get things done, then it is not a problem. We can plan and perform
things according to our own convince and interests. When somebody else is
involved and wants to get things done through them, there is a difficulty.
All sorts of problems arise; personalities come into contact and conflict.
Interpersonal problems crop up. We have to understand the behavior of other
people and must have knowledge as to how to motivate them in order to get things
done through them. We have to consider the conveniences and interest of others
also in
planning and implementing things.
In getting things done through others, people have to be coaxed, they have to be shown, they have to inspired, they have to be motivated and this is what management means. These activities are performed not only by the people at the top but from the chairman of the board to the front line supervisors and foremen. They use the above mentioned methods to get things done through other people.
A comprehensive definition of Management:
In mid 1940s, academic people from various business schools in the United States gathered together with the sole purpose of deciding whether a definition of management could be written that businessmen would accept and practice and academicians would teach. Ultimately they came up with the fallowing definition.
No individual is identified with this definition. The definition reads;
“Management is guiding human and physical resources into a dynamic organization units that attain their objectives to the satisfaction of those served and with the high degree of moral and sense of attainment on the part of those rendering the services”.
History of Management
While management has been present for millennia, several writers have created a background of works that assisted in modern management theories.
Sun Tzu's The Art of War
Written by Chinese general Sun Tzu in the 6th century BC, The Art of War is a military strategy book that, for managerial purposes, recommends being aware of and acting on strengths and weaknesses of both a manager's organization and a foe's. Download art of war here http://www.exalogics.com/mba/sun-tzu-art-of-war-PDF.pdf
Niccolò Machiavelli's The Prince
Believing that people were motivated by self-interest, Niccolò Machiavelli wrote The Prince in 1513 as advice for the leadership of Florence, Italy.[5] Machiavelli recommended that leaders use fear—but not hatred—to maintain control. Download at http://www.exalogics.com/mba/prince-by-nicolo-machiavelli.pdf
Adam Smith's The Wealth of Nations
Written in 1776 by Adam Smith, a Scottish moral philosopher, The
Wealth of Nations aims for efficient organization of work through Specialization
of labor. Smith described how changes in processes could boost productivity in
the manufacture of pins. While individuals could produce 200 pins per day, Smith
analyzed the steps involved in manufacture and, with 10 specialists, enabled
production of 48,000 pins per day.[5]
19th century
Classical economists such as Adam Smith (1723–1790) and John Stuart Mill (1806–1873) provided a theoretical background to resource-allocation, production, and pricing issues. About the same time, innovators like Eli Whitney (1765–1825), James Watt (1736–1819), and Matthew Boulton (1728–1809) developed elements of technical production such as standardization, quality-control procedures, cost-accounting, interchangeability of parts, and work-planning. Many of these aspects of management existed in the pre-1861 slave-based sector of the US economy. That environment saw 4 million people, as the contemporary usages had it, "managed" in profitable quasi-mass production. Download the book Wealth of Nations By Adam Smit here http://www.exalogics.com/mba/wealth-nations-adam-smith.pdf
By the late 19th century, marginal economists Alfred Marshall (1842–1924), Léon Walras (1834–1910), and others introduced a new layer of complexity to the theoretical underpinnings of management. Joseph Wharton offered the first tertiary-level course in management in 1881.
20th century
By about 1900 one finds managers trying to place their theories on what they regarded as a thoroughly scientific basis (see scientism for perceived limitations of this belief). Examples include Henry R. Towne's Science of management in the 1890s, Frederick Winslow Taylor's The Principles of Scientific Management (1911), Frank and Lillian Gilbreth's Applied motion study (1917), and Henry L. Gantt's charts (1910s). J. Duncan wrote the first college management textbook in 1911. In 1912 Yoichi Ueno introduced Taylorism to Japan and became first management consultant of the "Japanese-management style". His son Ichiro Ueno pioneered Japanese quality assurance.
The first comprehensive theories of management appeared around
1920. The Harvard Business School invented the Master of Business Administration
degree (MBA) in 1921. People like Henri Fayol (1841–1925) and Alexander Church
described the various branches of management and their inter-relationships. In
the early 20th century, people like Ordway Tead (1891–1973), Walter Scott and J.
Mooney applied the principles of psychology to management, while other writers,
such as Elton Mayo (1880–1949), Mary Parker Follett (1868–1933), Chester Barnard
(1886–1961), Max Weber (1864–1920), Rensis Likert (1903–1981), and Chris Argyris
(1923 - ) approached the phenomenon of management from a sociological
perspective.
Peter Drucker (1909–2005) wrote one of the earliest books on applied management:
Concept of the Corporation (published in 1946). It resulted from Alfred Sloan
(chairman of General Motors until 1956) commissioning a study of the
organisation. Drucker went on to write 39 books, many in the same vein.
H. Dodge, Ronald Fisher (1890–1962), and Thornton C. Fry introduced statistical
techniques into management-studies. In the 1940s, Patrick Blackett combined
these statistical theories with microeconomic theory and gave birth to the
science of operations research. Operations research, sometimes known as
"management science" (but distinct from Taylor's scientific management),
attempts to take a scientific approach to solving management problems,
particularly in the areas of logistics and operations.
Some of the more recent developments include the Theory of
Constraints, management by objectives, reengineering, Six Sigma and various
information-technology-driven theories such as agile software development, as
well as group management theories such as Cog's Ladder.
As the general recognition of managers as a class solidified during the 20th
century and gave perceived practitioners of the art/science of management a
certain amount of prestige, so the way opened for popularised systems of
management ideas to peddle their wares. In this context many management fads may
have had more to do with pop psychology than with scientific theories of
management.
Towards the end of the 20th century, business management came to consist of six
separate branches, namely: Human resource management
Operations management or production management
Strategic management
Marketing management
Financial management
Information technology management responsible for management information systems
21st century
In the 21st century observers find it increasingly difficult to subdivide management into functional categories in this way. More and more processes simultaneously involve several categories. Instead, one tends to think in terms of the various processes, tasks, and objects subject to management.
Branches of management theory also exist relating to nonprofits and to government: such as public administration, public management, and educational management. Further, management programs related to civil-society organizations have also spawned programs in nonprofit management and social entrepreneurship.
Note that many of the assumptions made by management have come under attack from business ethics viewpoints, critical management studies, and anti-corporate activism.
As one consequence, workplace democracy has become both more common, and more advocated, in some places distributing all management functions among the workers, each of whom takes on a portion of the work. However, these models predate any current political issue, and may occur more naturally than does a command hierarchy. All management to some degree embraces democratic principles in that in the long term workers must give majority support to management; otherwise they leave to find other work, or go on strike. Despite the move toward workplace democracy, command-and-control organization structures remain commonplace and the de facto organization structure. Indeed, the entrenched nature of command-and-control can be seen in the way that recent layoffs have been conducted with management ranks affected far less than employees at the lower levels of organizations. In some cases, management has even rewarded itself with bonuses when lower level employees have been laid off.
What
is Management?
Introduction:
Management is a vital aspect of the economic life of man, which
is an organized group activity. A central directing and controlling agency
is indispensable for a
business concern. The productive resources – material, labour, capital etc. are
entrusted to the organizing skill, administrative ability and enterprising
initiative of the management. Thus, management provides leadership to a business
enterprise. Without able managers and effective managerial leadership the
resources of production remain merely resources and never become production.
Under competitive economy and ever-changing environment the quality and
performance of managers determine both the survival as well as success of any
business enterprise.
Management occupies such an important place in the modern world that the welfare of the people and the destiny of the country are very much influenced by it.
Definition:
“Management is the process of getting things done through the
efforts of other people in order to achieve the predetermined objectives
of organization”.
Management may also be define as: “The process by which execution of given
purpose put into operation and supervise”.
A concise statement: “The function of executive leadership anywhere”.
Another statement:
Management may be defined as “A technique by which the purpose and objectives of particular human group are determined, defined, clarified and completed
From business Pont of view:
“Management is the art of securing maximum results with the minimum of efforts so as to get maximum prosperity and happiness for both employer and employee and give public the best possible service”.
Complete definition of management:
“Management is a distinct process consisting of planning, organizing, staffing, leading and controlling utilizing both in each science and art and followed in order to accomplish predetermined objectives of the organization”.
| Entity identity | ||||
| Management is a distinct process consisting of | ||||
| Planning | Organizing | Staffing | Leading | Controlling |
| Applied to | ||||
| Efforts of a group of people to utilize effective available recourses | ||||
| Man | Money | Material | Method | Machine |
| In order to achieve predetermined objectives of an organization | ||||
Necessity of Management:
(1) Management is an essential activity of all organizational
level (Low, middle, and upper level)
(2) Management applies to:
(i) Small and large Organizations.
(ii) Profit and non profit Organization.
(iii) Manufacturing Organization.
(iv) Service rendering Organization.
Manager:
Manager is also known as leader and administrative, Manager is a person who under take the tasks and function of managing at any level, in any kind of enterprise.
Managerial Skills:
There are four skills of managers are expected to have ability of:
Technical skills:
Technical skills that reflect both an understanding of and a
proficiency in a specialized field. For example, a manager may have
technical skills in accounting,
finance, engineering, manufacturing, or computer science.
Human Skills:
Human skills are skills associated with manager’s ability to work well with others, both as a member of a group and as a leader who gets things done through other.
Concept Skills:
Conceptual skills related to the ability to visualize the
organization as a whole, discern interrelationships among organizational
parts, and understand how the
organization fits into the wider context of the industry, community, and world.
Conceptual skills, coupled with technical skills, human skills and knowledge
base, are important ingredients in organizational performance.
Design Skills:
It is the ability to solve the problems in ways that will benefit the enterprise. Managers must be able to solve the problems.
The Skills vary at different managerial levels:
| Top management | Concept and design Skills |
| Middle | Human Skills. |
| Supervisor’s | Technical skills |
The Function of Managers:
There are five functions of managers:
| Planning | Organizing | Staffing | Leading | Controlling |
The functions of managers provide a useful structure for organizing management knowledge.
(1) Planning
Planning involves selecting missions and objectives and the action to achieve
them it requires decision making, that choosing future courses of action from
among alternatives. There are five types of planning:
1. Missions and objectives.
2. Strategies and polices.
3. Procedures and rules.
4. Programs.
5. Budgets.
(2) Organizing
Organizing is the part of managing that involves establishing an intentional structure of roles for people to fill in an organization. The purpose of an organization structure is to creating an environment helpful for human performance. It is then management tools and not an end. Although the structure must define the task to be done, the rules so established must also be designed in the light of the abilities and motivations of the people available designing an effective organization structure is not an easy managerial task.Many problems arises in making structures fit situations.
(3) Staffing
Staffing involves filling and keeping filled, the positions in the organization. This is done by identifying the work force requirement inventorying the people available and recruiting, selecting, placing, promoting, appraising, planning the careers, compensating and training.
(4) Leading
Leading is influence people so that they will contribute to organization and group goals. All managers would agree that most problems arises from peoples desires and
problems , their behavior as individuals and in groups and that effective managers also need to be effective leaders.
Leading involves motivation, leadership styles and approaches and communications.
(5) Controlling:
Controlling is measuring and correcting individuals and organizational
performance.
It involves measuring performance against goals and plans, showing where the
deviations from standards exit and helping to correct them. In short controlling
facilitates the accomplishment of plans.Controll activity generally relate to
the
measurement of achievement. Some means of controlling like the budget for
expenses, inspection, record of labors-hours lost, are generally familiar. Each
shows
whether plans are working out.
The Evolution of Management
The origin of management can be traced back to the days when man started living in groups. History reveals that strong men organized the masses into groups according to their intelligence, physical and mental capabilities. Evidence of the use of the well recognized principles of management is to be found in the organization of public life in ancient Greece, the organization of the Roman Catholic Church and the organization of military forces. Thus management in some form or the other has been practiced in the various parts of the world since the dawn of civilization. With the on set of Industrial Revolution, however, the position underwent a radical change. The structure of industry became extremely complex. At this stage, the development of a formal theory of management became absolutely necessary. It was against this background that the pioneers of modern management thought laid the foundations of modern management theory and practice.
Different Author says that history of management is different Author contribute in management. There are so many theories of management that why also called Jungle of management.
Different period of management:
1. Scientific Management:
(i)Fredrick Taylor.
(ii)Henry L.Gantt.
(iii)Frank and Lillian Gilberth.
2. Operational Management
(i) Henri Fayol.
3. Behavioral Science:
(i) Munster berg.
4. System Theory.
(i) Chester Barnard
5. Modern Management /Recent contribution to management thoughts.
(i) Peter F.Drucker 1974.
(ii) Edwards.
(iii) Thomas Peter & Robert Waterman.1982
1. Scientific Management:
F.W. Taylor and Henry Fayol are generally regarded as the founders of scientific
management and administrative management and both provided the bases for science
and art of management.
Features of Scientific Management:
1. It was closely associated with the industrial revolution and the rise of
large-scale
enterprise.
2. Classical organization and management theory is based on contributions from a
number of sources. They are scientific management, Administrative management
theory, bureaucratic model, and micro-economics and public administration.
3. Management thought focused on job content division of labour,
standardization,
simplification and specialization and scientific approach towards organization.
Taylor's
Scientific Management (USA 1856-1915):
Started as an apprentice machinist in Philadelphia, USA. He rose to be the chief
engineer at the Midvale Engineering Works and later on served with
the Bethlehem Works where he experimented with his ideas and made
the contribution to the management theory for which he is so well
known. Frederick Winslow Taylor well-known as the founder of
scientific management was the first to recognize and emphasis the
need for adopting a scientific approach to the task of managing an enterprise.
He tried
to diagnose the causes of low efficiency in industry and came to the conclusion
that
much of waste and inefficiency is due to the lack of order and system in the
methods
of management. He found that the management was usually ignorant of the amount
of
work that could be done by a worker in a day as also the best method of doing
the job.
As a result, it remained largely at the mercy of the workers who deliberately
shirked
work. He therefore, suggested that those responsible for management should adopt
a
scientific approach in their work, and make use of "scientific method" for
achieving
higher efficiency. The scientific method consists essentially of
(a) Observation
(b) Measurement
(c) Experimentation and
(d) Inference.
He advocated a thorough planning of the job by the management and emphasized the necessity of perfect understanding and co-operation between the management and the workers both for the enlargement of profits and the use of scientific investigation and knowledge in industrial work. He summed up his approach in these words: Science, not rule of thumb Harmony, not discord Co-operation, not individualism Maximum output, in place of restricted output The development of each man to his greatest efficiency and prosperity. Elements of Scientific Management: The techniques which Taylor regarded as its essential elements or features may be classified as under:
1. Scientific Task and Rate-setting, work improvement,
etc.
2. Planning the Task.
3. Vocational Selection and Training
4. Standardization (of working conditions, material equipment etc.)
5. Specialization
6. Mental Revolution.
1. Scientific Task and Rate-Setting (work study): Work study may be defined as the systematic, objective and critical examination of all the factors governing the operational efficiency of any specified activity in order to effect improvement. Work study includes.
(a) Methods Study: The management should try to ensure that the plant is laid out in the best manner and is equipped with the best tools and machinery. The possibilities of eliminating or combining certain operations may be studied.
(b) Motion Study: It is a study of the movement, of an operator (or even of a machine) in performing an operation with the purpose of eliminating useless motions.
(c) Time Study (work measurement): The basic purpose of time study is to determine the proper time for performing the operation. Such study may be conducted after the motion study. Both time study and motion study help in determining the best method of doing a job and the standard time allowed for it.
(d) Fatigue Study: If, a standard task is set without providing for measures to eliminate fatigue, it may either be beyond the workers or the workers may over strain themselves to attain it. It is necessary, therefore, to regulate the working hours and provide for rest pauses at scientifically determined intervals.
(e) Rate-setting: Taylor recommended the differential piece wage system, under which workers performing the standard task within prescribed time are paid a much higher rate per unit than inefficient workers who are not able to come up to the standard set.
2. Planning the Task: Having set the task which an average worker must strive to perform to get wages at the higher piece-rate, necessary steps have to be taken to plan the production thoroughly so that there is no bottle neck and the work goes on systematically.
3. Selection and Training: Scientific Management requires a radical change in
the
methods and procedures of selecting workers. It is therefore necessary to
entrust
the task of selection to a central personnel department. The procedure of
selection
will also have to be systematized. Proper attention has also to be devoted to
the
training of the workers in the correct methods of work.
4. Standardization: Standardization may be introduced in respect of the following.
(a) Tools and equipment: By standardization is meant the process of bringing
about uniformity. The management must select and store standard tools and
implements which will be nearly the best or the best of their kind.
(b) Speed: There is usually an optimum speed for every machine. If it is exceeded, it is likely to result in damage to machinery.
(c) Conditions of Work: To attain standard performance, the maintenance of
standard conditions of ventilation, heating, cooling, humidity, floor space,
safety
etc., is very essential.
(d) Materials: The efficiency of a worker depends on the quality of materials and the method of handling materials.
5. Specialization: Scientific management will not be complete without the introduction of specialization. Under this plan, the two functions of 'planning' and 'doing' are separated in the organization of the plant. The `functional foremen' are specialists who join their heads to give thought to the planning of the performance of operations in the workshop. Taylor suggested eight functional foremen under his scheme of functional foremanship.
(a) The Route Clerk: To lay down the sequence of operations and instruct the workers concerned about it.
(b) The Instruction Card Clerk: To prepare detailed instructions regarding different aspects of work.
(c) The Time and Cost Clerk: To send all information relating to their pay to the workers and to secure proper returns of work from them.
(d) The Shop Disciplinarian: To deal with cases of breach of
discipline and
absenteeism.
(e) The Gang Boss: To assemble and set up tools and machines and to teach the
workers to make all their personal motions in the quickest and best way.
(f) The Speed Boss: To ensure that machines are run at their best speeds and
proper tools are used by the workers.
(g) The Repair Boss: To ensure that each worker keeps his machine in good order
and maintains cleanliness around him and his machines.
(h) The Inspector: To show to the worker how to do the work.
6. Mental Revolution: At present, industry is divided into two groups – management and labour. The major problem between these two groups is the division of surplus.The management wants the maximum possible share of the surplus as profit; the workers want, as large share in the form of wages. Taylor has in mind the enormous gain that arises from higher productivity. Such gains can be shared both by the management and workers in the form of increased profits and increased wages.
Benefits of Scientific Management:
Taylor's ideas, research and recommendations brought into focus technological,
human and organizational issues in industrial management.
Benefits of Taylor's scientific management included wider scope for
specialization,
accurate planning, timely delivery, standardized methods, better quality, lesser
costs,
minimum wastage of materials, time and energy and cordial relations between
management and workers. According to Gilbreths, the main benefits of scientific
management are "conservation and savings, making an adequate use of every one's
energy of any type that is expended". The benefits of scientific management
are:-
-
Replacement of traditional rule of thumb method by scientific techniques.
-
Proper selection and training of workers.
-
Incentive wages to the workers for higher production.
-
Elimination of wastes and rationalization of system of control.
-
Standardization of tools, equipment, materials and work methods.
Detailed instructions and constant guidance of the workers
Establishment of harmonious relationship between the workers.
Better utilization of various resources.
Satisfaction of the needs of the customers by providing higher quality products at lower prices.
Criticism:
1. Worker's Criticism:
(a) Speeding up of workers: Scientific Management is only a device to speed up
the
workers without much regard for their health and well-being.
(b) Loss of individual worker's initiative: Scientific Management reduces
workers
to automatic machine by taking away from them the function of thinking.
(c) Problem of monotony: By separating the function of planning and thinking
from that of doing, Scientific Management reduces work to mere routine.
(d) Reduction of Employment: Scientific Management creates unemployment and
hits the workers hard.
(e) Weakening of Trade Unions: Under Scientific Management, the important
issues of wages and working conditions are decided by the management through
scientific investigation and the trade unions may have little say in the matter.
(f) Exploitation of workers: Scientific Management improves productivity through
the agency of workers and yet they are given a very small share of the benefit
of
such improvement.
2. Employer's Criticism:
(a) Heavy Investment: It requires too heavy an investment. The employer has to
meet the extra cost of the planning department though the foreman in this
department do not work in the workshop and directly contribute towards higher
production.
(b) Loss due to re-organization: The introduction of Scientific Management
requires a virtual reorganization of the whole set-up of the industrial unit.
Work may have to be suspended to complete such re-organization.
(c) Unsuitable for small scale firms: various measures like the establishment of
a
separate personnel department and the conducting of time and motion studies are
too expensive for a small or modest size industrial unit.
Henry Lawrence Gantt (USA, 1861 - 1819):
H.L Gantt was born in 1861. He graduated from John Hopkins
College. For some time, he worked as a draftsman in an iron
foundry.
In 1884, he qualified as a mechanical engineer at Stevens Institute.
In 1887, he joined the Midvale Steel Company. Soon, he became an
assistant to F.W Taylor. He worked with Taylor from 1887 - 1919 at Midvale Steel
Company. He did much consulting work on scientific selection of workers and the
development of incentive bonus systems. He emphasized the need for developing a
mutuality of interest between management and labour. Gantt made four important
contributions to the concepts of management:
1. Gantt chart to compare actual to planned performance. Gantt chart was a daily
chart which graphically presented the process of work by showing machine
operations, man hour performance, deliveries, effected and the work in arrears.
This chart was intended to facilitate day-to-day production planning.
2. Task-and-bonus plan for remunerating workers indicating a more humanitarian approach. This plan was aimed at providing extra wages for extra work besides guarantee of minimum wages. Under this system of wage payment, if a worker completes the work laid out for him, he is paid a definite bonus in addition to his daily minimum wages. On the other hand, if a worker does not complete his work, he is paid only his daily minimum wages. There was a provision for giving bonus to supervisors, if workers under him were able to earn such bonus by extra work.
3. Psychology of employee relations indicating management responsibility to teach and train workers. In his paper "Training Workmen in Habits of Industry and Cooperation", Gantt pleaded for a policy of preaching and teaching workmen to do their work in the process evolved through pre-thinking of management.
4. Gantt laid great emphasis on leadership. He considered management as leadership function. He laid stress on the importance of acceptable leadership as the primary element in the success of any business.
Gantt's contributions were more in the nature of refinements rather than fundamental concepts. They made scientific management more humanized and meaningful to devotees of Taylor.
Frank (USA, 1867 - 1924) and Lillian (U.S.A, 1878 - 1912):
The ideas of Taylor were also strongly supported and developed by the famous husband and wife team of Frank and Lillian Gilbreth. They became interested in wasted motions in work. After meeting Taylor, they combined their ideas with Taylor's to put scientific management into effect. They made pioneering effort in the field of motion study and laid the entire foundation of our modern applications of job simplification, meaningful work standards and incentive wage plans. Mrs. Gilbreth had a unique background in psychology and management and the couple could embark on a quest for better work methods. Frank Gilbreth is regarded as the father of motion study. He is responsible for inculcating in the minds of managers the questioning frame of mind and the search for a better way of doing things.
Gilbreth's contributions to management thought are quite considerable. His main contributions are:
(a) The one best way of doing a job is the way which involves the fewest motions performed in an accessible area and in the most comfortable position. The best way can be found out by the elimination of inefficient and wasteful motions involved in the work.
(b) He emphasized that training should be given to workers from the very
beginning
so that they may achieve competence as early as possible.
(c) He suggested that each worker should be considered to occupy three positions
-
(i)
the job he held before promotion to his present position,
(ii) his present
position,
and (iii) The next higher position. The part of a worker's time should be spent
in
teaching the man below him and learning from the man above him. This would help
him qualify for promotion and help to provide a successor to his current job.
(d) Frank and Lillian Gilberth also gave a thought to the welfare of the individuals who work for the organization.

Gantt's contributions were more in the nature of refinements rather than fundamental concepts. They made scientific management more humanized and meaningful to devotees of Taylor.
Frank
(USA, 1867 - 1924) and Lillian (U.S.A, 1878 - 1912)
The ideas of Taylor were also strongly supported and developed by the famous
husband and wife team of Frank and Lillian Gilbreth. They
became interested in wasted motions in work. After meeting
Taylor, they combined their ideas with Taylor's to put scientific
management into effect. They made pioneering effort in the
field of motion study and laid the entire foundation of our modern applications
of job
simplification, meaningful work standards and incentive wage plans. Mrs.
Gilbreth
had a unique background in psychology and management and the couple could
embark on a quest for better work methods.
Frank
Gilbreth is regarded as the father of motion study. He is responsible for
inculcating in
the minds of managers the questioning frame of mind and the search for a better
way
of doing things.
Gilbreth's contributions to management thought are quite considerable. His main
contributions are:
(a) The one best way of doing a job is the way which involves the fewest motions performed in an accessible area and in the most comfortable position. The best way can be found out by the elimination of inefficient and wasteful motions involved in the work.
(b) He emphasized that training should be given to workers from the very
beginning
so that they may achieve competence as early as possible.
(c) He suggested that each worker should be considered to occupy three positions
-
(i)
the job he held before promotion to his present position, (ii) his present
position,
and
(iii) The next higher position. The part of a worker's time should be spent
in
teaching the man below him and learning from the man above him. This would help
him qualify for promotion and help to provide a successor to his current job.
(d) Frank and Lillian Gilberth also gave a thought to the welfare of the individuals who work for the organization.
(e) Gilbreth also devised methods for avoiding wasteful and unproductive movements. He laid down how workers should stand, how his hands should move and so on.
(2) Operational Management
Henri Fayol: The Father of modern operational theory.
Perhaps the real father of modern management theory is the (French
industrialist)
Henri Fayol. His acute observations on the Principles of general
management first appeared in 1916 in French, under the little
“admistration industrielte in generale “.
This monograph, reprinted in French several times, was not translated
into English until 1929. No English translation was made or published in the US
until
1949.
Industrial Activities:
Fayol found that industrial activates could be divided into six groups as shown in figure.
1. Technical (Production)
2. Commercial (buying, Selling and exchanging).
3. Financial (Search for, and optimum use of capital).
4. Security (Protection of property and persons).
5. Accounting (including Statistics).
6. Managerial (Planning, organization, command, contribution and control).
Henri Fayol pointed out that these activities exist in every size of business.
Fayol
observed that first five were well known and he devoted most of his book to an
analysis of the sixth.
| Financial | ||
| Commercial | Security | |
| Managers Activities | ||
| Technical | Accounting | |
| Managerial |
Managerial Planning, Organization, Staffing, Leading, Control. Fayol’s activities in industrial undertaking: General Principles of Management:
Fayol listed Fourteen Principles based on experience. He noting that Principles of management are flexible, not absolute and must be usable regard less of changing and special conditions. Some kinds of Principles appeared to be indispensable in every undertaking.
1. Division of Work :-
Fayol applies the principle to all kind of work, management as well as
technical.
2. Authority and responsibility :Henri Fayol finds authority and responsibility to be related with the latter
arising
from the former. He sees authority as a combination of official factors,
manager’s
position and personal factors, “Compounded of intelligence, experience, moral
worth, past services etc.
3. Discipline :
Fayol declares that discipline requires good superiors at all levels.
4. Unity of Command: This means that employees should receive order from one superior only.
5. Unity Of Direction: According to this principal, each group of activities with same objective must
have one head and one plan.
6. Subordination of individuals to general interest: When the two are found to differ, management must reconcile them.
7. Remuneration: Remuneration and method of payment should b fair and have maximum possible
satisfaction to employees and employer.
8. Centralization: Without using the term centralization of authority ‘’Fayol refers authority
dispersed or concentrated.
9. Scalar Chain: Fayol thinks of this as “Chain of Superior” from beigest to low ranks should be
short circuited.
10. Order:
Fayol classify this into “material” and “social” order. This is essential
principle in
arrangement of things and people in an organization.
11. Equity: Loyalty and devotion should be elected from personnel on biases of kindliness
and justice, when dealing with subordinate.
12. Stability of tenure:
In bad management, Fayol points out id dangers and costs.
13. Initiative:
Initiative is execution of a plan.
14. Esprit decrops:
This is the principle that in the union there is strength. This principle
emphasis on
work, Unity of communication. In order to accomplishment of objective.
Element of Management:
Fayol said the element of management is its functions. Planning, Organizing, Staffing, Leading, and controlling. He point out that the principles of management can apply not only to business but also to practical, religious, military and other understanding.
The theorists who contributed to this school viewed employees as individuals, resources, and assets to be developed and worked with — not as machines, as in the past. Several individuals and experiments contributed to this theory.
George
Elton Mayo (Australia, 1880 - 1949):
Elton Mayo was born in Australia. He was educated in Logic and Philosophy at St. Peter's College, Adelaide. He led a team of researchers from Harvard University, which carried out investigation in human problems. Elton Mayo’s contributions came as part of the Hawthorne studies, a series of experiments that rigorously applied classical management theory only to reveal its shortcomings. The Hawthorne experiments consisted of two studies conducted at the Hawthorne Works of the Western Electric Company in Chicago from 1924 to 1932. The first study was conducted by a group of engineers seeking to determine the relationship of lighting levels to worker productivity. Surprisingly enough, they discovered that worker productivity increased as the lighting levels decreased — that is, until the employees were unable to see what they were doing, after which performance naturally declined.
A few years later, a second group of experiments began. Harvard researchers Mayo and F. J. Roethlisberger supervised a group of five women in a bank wiring room. They gave the women special privileges, such as the right to leave their workstations without permission, take rest periods, enjoy free lunches, and have variations in pay levels and workdays. This experiment also resulted in significantly increased rates of productivity.
In this case, Mayo and Roethlisberger concluded that the increase in productivity resulted from the supervisory arrangement rather than the changes in lighting or other associated worker benefits. Because the experimenters became the primary supervisors of the employees, the intense interest they displayed for the workers was the basis for the increased motivation and resulting productivity. Essentially, the experimenters became a part of the study and influenced its outcome. This is the origin of the term Hawthorne effect, which describes the special attention researchers give to a study’s subjects and the impact that attention has on the study’s findings. The general conclusion from the Hawthorne studies was that human relations and the social needs of workers are crucial aspects of business management. This principle of human motivation helped revolutionize theories and practices of management.
Max
Weber Theory of bureaucracy:
He disliked that many European organizations were managed on a “personal” family-like basis and that employees were loyal to individual supervisors rather than to the organization. He believed that organizations should be managed impersonally and that a formal organizational structure, where specific rules were followed, was important. In other words, he didn’t think that authority should be based on a person’s personality.
He thought authority should be something that was part of a person’s job and passed from individual to individual as one person left and another took over. This no personal, objective form of organization was called a bureaucracy. Weber believed that all bureaucracies have the following characteristics: A well-defined hierarchy. All positions within a bureaucracy are structured in a way that permits the higher positions to supervise and control the lower positions.
This clear chain of command facilitates control and order throughout the organization. Division of labor and specialization. All responsibilities in an organization are specialized so that each employee has the necessary expertise to do a particular task. Rules and regulations. Standard operating procedures govern all organizational activities to provide certainty and facilitate coordination. Impersonal relationships between managers and employees. Managers should maintain an impersonal relationship with employees so that favoritism and personal prejudice do not influence decisions. Competence. Competence, not “who you know,” should be the basis for all decisions made in hiring, job assignments, and promotions in order to foster ability and merit as the primary characteristics of a bureaucratic organization. Records. A bureaucracy needs to maintain complete files regarding all its activities.
4. System Approach:
The systems approach to management indicates the fourth major theory of management thought called modern theory. Modern theory considers an organization as an adaptive system which has to adjust to changes in its environment. An organization is now defined as a structured process in which individuals interact for attaining objectives. Meaning of "System": The word system is derived from the Greek word meaning to bring together or to combine. A system is a set of interconnected and inter-related elements or component parts to achieve certain goals. A system has three significant parts:
1. Every system is goal-oriented and it must have a purpose or objective to be
attained.
2. In designing the system we must establish the necessary arrangement of
components.
3. Inputs of information, material and energy are allocated for processing as
per plan
so that the outputs can achieve the objective of the system.

Chester Barnard (1886 – 1961):
He president of New Jersey Bell Telephone Company, introduced the idea of the
informal organization —cliques (exclusive groups of people) that
naturally form within a company. He felt that these informal
organizations provided necessary and vital communication functions for
the overall organization and that they could help the organization
accomplish its goals. Barnard felt that it was particularly important for
managers to
develop a sense of common purpose where a willingness to cooperate is strongly
encouraged. He is credited with developing the acceptance theory of management,
which emphasizes the willingness of employees to accept that mangers have
legitimate authority to act. Barnard felt that four factors affected the
willingness of
employees to accept authority: The employees must understand the communication.
The employees accept the communication as being consistent with the
organization’s purposes. The employees feel that their actions will be
consistent with the needs and desires
of the other employees. The employees feel that they are mentally and physically
able to carry out the
order. Barnard’s sympathy for and understanding of employee needs positioned him
as a
bridge to the behavioral school of management, the next school of thought to
emerge.
5. Modern Management /Recent contribution to management thoughts:
Peter Ferdinand Drucker (November 19, 1909–November 11, 2005):
He was a writer, management consultant, and self-described “social ecologist.”
Widely considered to be "the father of modern management,” his 39
books and countless scholarly and popular articles explored how
humans are organized across all sectors of society—in business,
government and the nonprofit world.
His writings have predicted many of the major developments of the late twentieth
century, including privatization and decentralization; the rise of Japan to
economic
world power; the decisive importance of marketing; and the emergence of the
information society with its necessity of lifelong learning. In 1959, Drucker
coined
the term “knowledge worker" and later in his life considered knowledge work
productivity to be the next frontier of management.Basic ideas: Decentralization and simplification: Drucker discounted the command
and control
model and asserted that companies work best when they are decentralized.
According to Drucker, corporations tend to produce too many products, hire employees they don't need (when a better solution would be outsourcing), and expand into economic sectors that they should avoid. Respect of the worker: Drucker believed that employees are assets and not liabilities. He taught that knowledge workers are the essential ingredients of the modern economy. Central to this philosophy is the view that people are an organization's most valuable resource and that a manager's job is to prepare and free people to perform. The need to manage business by balancing a variety of needs and goals, rather than subordinating an institution to a single value. This concept of management by objectives forms the keynote of his 1954 landmark "The Practice of Management".
A company's primary responsibility is to serve its customers. Profit is not the primary goal, but rather an essential condition for the company's continued existence. An Organization should have a proper way of executing all its business processes. A belief in the notion that great companies could stand among humankind's noblest inventions.
William Edwards Deming (October 14, 1900 – December 20, 1993):
He was an American statistician, professor, author, lecturer, and consultant.
Deming
is widely credited with improving production in the United States
during World War II, although he is perhaps best known for his work
in Japan. There, from 1950 onward he taught top management how to
improve design (and thus service), product quality, testing and sales
(the last through global markets) through various methods, including
the application of statistical methods.
Deming made a significant contribution to Japan's later-renown-for innovative
high-quality products and its economic power. He is regarded as having had more
impact
upon Japanese manufacturing and business than any other individual not of
Japanese
heritage. Despite being considered something of a hero in Japan, he was only
beginning to win widespread recognition in the U.S. at the time of his death.
Deming philosophy synopsis:
The philosophy of W. Edwards Deming has been summarized as follows: "Dr. W. Edwards Deming taught that by adopting appropriate principles of management, organizations can increase quality and simultaneously reduce costs (by reducing waste, rework, staff attrition and litigation while increasing customer loyalty). The key is to practice continual improvement and think of manufacturing as a system, not as bits and pieces." In the 1970s, Dr. Deming's philosophy was summarized by some of his Japanese proponents with the following 'a'-versus-'b' comparison:
(a) When people and organizations focus primarily on quality, defined by the following ratio, Results of work efforts
Quality = Total Cost
Quality tends to increase and costs fall over time.
(b) However, when people and organizations focus primarily on costs, costs tend
to
rise and quality declines over time.
Deming's 14 points:
Deming offered fourteen key principles for management for transforming business
effectiveness. The points were first presented in his book Out of the Crisis.
1. Create constancy of purpose toward improvement of product and service, with
the aim to become competitive and stay in business, and to provide jobs.
2. Adopt the new philosophy. We are in a new economic age. Western
management must awaken to the challenge, must learn their responsibilities,
and take on leadership for change.
3. Cease dependence on inspection to achieve quality. Eliminate the need for
inspection on a mass basis by building quality into the product in the first
place.
4. End the practice of awarding business on the basis of price tag. Instead,
minimize total cost. Move towards a single supplier for any one item, on a
long-term relationship of loyalty and trust.
5. Improve constantly and forever the system of production and service, to
improve quality and productivity, and thus constantly decrease cost.
6. Institute training on the job.
7. Institute leadership. The aim of supervision should be to help people and
machines and gadgets to do a better job. Supervision of management is in
need of overhaul, as well as supervision of production workers.
8. Drive out fear, so that everyone may work effectively for the company.
9. Break down barriers between departments. People in research,
design, sales,
and production must work as a team, to foresee problems of production and in
use that may be encountered with the product or service.
10. Eliminate slogans, exhortations, and targets for the work force asking for
zero
defects and new levels of productivity. Such exhortations only create
adversarial relationships, as the bulk of the causes of low quality and low
productivity belong to the system and thus lie beyond the power of the work
force.
11. (a) Eliminate work standards (quotas) on the factory floor. Substitute
leadership.
(b) Eliminate management by objective. Eliminate management by numbers,
numerical goals. Substitute workmanship.
12. (a) Remove barriers that rob the hourly worker of his right to pride of
workmanship. The responsibility of supervisors must be changed from sheer
numbers to quality.
(b) Remove barriers that rob people in management and in engineering of
their right to pride of workmanship. This means, inter alia, abolishment of the
annual or merit rating and of management by objective.
13. Institute a vigorous program of education and self-improvement.
14. Put everyone in the company to work to accomplish the transformation. The
transformation is everyone's work. "Massive training is required to instill the
courage to break with tradition. Every activity and every job is a part of the
process."
In Search of Excellence Thomas Peters & Robert Waterman 1982:
“In Search of Excellence” is an international bestselling book written by Tom
Peters
and Robert H. Waterman, Jr. First published in 1982 it is one of the biggest
selling
and most widely read business books ever, selling 3 million copies in its first
four
years, and being the most widely held library book in the United States from
1989 to
2006 (WorldCat data). The book explores the art and science of management used
by leading 1980s companies with records of long-term profitability
and continuing
innovation.
Peters and Waterman found eight common themes which they argued were
responsible for the success of the chosen corporations. The book devotes one
chapter
to each theme.
1.. A bias for action, active decision making - 'getting on with it'.
2. Close to the customer - learning from the people served by the business.
3. Autonomy and entrepreneurship - fostering innovation and nurturing
'champions'.
4. Productivity through people- treating rank and file employees as a source of
quality.
5. Hands-on, value-driven - management philosophy that guides everyday
practice - management showing its commitment.
6. Stick to the knitting - stay with the business that you know.
7. Simple form, lean staff - some of the best companies have minimal HQ staff.
8. Simultaneous loose-tight properties - autonomy in shop-floor activities plus
centralized values.
Planning
The Nature and purpose of planning
o The contribution of planning to purpose and objectives
o The primacy of planning
o The pervasiveness of planning
o The efficiency of plans
Types of planning
o Purpose, mission and objectives
o Strategies and policies
o Procedures and rules
o Programs
o Budget
Steps in planning
o Awareness op opportunities
o Setting objectives
o Developing performance
o Identifying alternative courses of action
o Evaluating alternative courses
o Selecting a course
o Formulating derivative plan
o Numbrising plans by making budgets
The Planning process
Management by objectives (MBO)
o Benefits of MBO
o Weaknesses of MBO
Decision making
o Rational decision making
o Steps in decision making
Quantitative & qualitative factors
Managerial analysis
PLANNING:
What is planning?
There are many definitions of planning. Planning may define as: According to Fayol - "The plan of action is, at one and the same time, the result envisaged, the line of action to be followed, the stages to go through, and the methods to use. It is a kind of future picture wherein proximate events are outlined with some distinctness...."
Planning is deciding in advance what is to be done. It involves the selection of
objectives, policies, procedures and programmes from among alternatives. A plan
is a
predetermined course of action to achieve a specified goal. It is a statement of
objectives to be achieved by certain means in the future. In short, it is a
blueprint for
action.
According to Louis A Allen - "Management planning involves the development of
forecasts, objectives, policies, programmes, procedures, schedules and budgets".
According to Theo Haimann - "Planning is deciding in advance what is to be done.
When a manager plans, he projects a course of action, for the future, attempting
to
achieve a consistent, co-ordinated structure of operations aimed at the desired
results".
According to Koontz O’Donnell - "Planning is an intellectual process, the conscious determination of courses of action, the basing of decisions on purpose, acts and considered estimates".
1. PLANNING IS THE PRE-SELECTION:
Planning is the pre-selection of objectives and outlines the action before starting any business.
2. ANOTHER WORDS
Planning is selection of mission, objectives and true strategies, polices programs and procedure to achieve them.
3. SIMPLEST DIFINATION OF PLANNING:
Planning is decision making in advance.
4. ANOTHER DEFINATION:
Choosing the alternatives and making the decision is called planning.
THE NATURE & PURPOSE OF PLANNING:
The essential nature of planning can be defined by dividing it into four Major aspects.
1. THE CONTRIBUTION OF PLANNING TO PURPOSE AND OBJECTIVE:
Every plan and all its supporting plans should contribute accomplishment of the
purpose and objectives of the enterprise. This concept an use in organized
enterprise
which try to accomplishment of group purpose through deliberate cooperation.
2. THE PRAMACY OF PLANNING:
Since managerial functions like organizing, Staffing, Leading and controlling
support
to the accomplishment of enterprise objectives, planning logically precedes or
help
the accomplishment of all other managerial functions. Because Manager must plan
on
order to know what kinds f organization relationship and personal qualifications
are
needed, which method should be fild by subordinates and what kind of control is
to
applied. All the other Managerial functions must be planned if they are to be
effective.
3. THE PERVASIVENESS OF PLANNING:
Planning is the function of all Managers, although the character and breadth of
planning will vary with each Managers authority and with nature of polices and
plans
outlined by superiors. If Managers are not allowed a certain degree of
discretion and
planning responsibility they are not truly Managers.
If we recognize the pervasiveness of planning, we can more easily understand why
some people distinguish between the “manager” and the “administrator” or
“supervisor” one manager, because of his or her authority or position in the
organization, may do more important planning than another, or the planning of
one
may be more basic than that of another and applicable to a large portion of the
enterprise. However, all managers from presidents to first level supervisors
plan.
Even the head of a road gang or a factory crew plans in a limited area under
fairly strict rules and procedures. A principal factor in a success of
supervisors at the lowest
organization level is their ability to plan.
4. THE EFFIENCY OF PLANS
Plans are efficient, if they achieve their purpose at a reasonable cost, when
cost is
measured not only in terms of times or money or production but also in degree of
individual and group satisfaction.
Many managers have followed plans whose costs were greater than the revenue that could be obtained. For example, one airline acquired certain aircraft with costs exceeding revenues. Companies have also tried to sell products that were unacceptable to the market. Plan can even make it impossible to achieve objects if they make enough people in an organization this satisfied or unhappy.
TYPES OF PLANNING
The failure of some managers is inability to recognize the several types of plans. This makes difficulty in making planning effective. Plans are classified as:-
1. PURPOSE AND MISSIONS & OBJECTIVES
This mission identifies the basic functions or tasks of an enterprise. However, an objective is the end toward which an activity is aimed. Objectives in other words. Are ends toward which organizational and individual activities or directed. Objectives are the end point toward which all managerial functions, (Planning, Organizing, Leading, Staffing, and Controlling) are aimed. Objectives form a hierarchy ranging from individual objectives to broad aims.
2. STRATEGIES & POLICIES
Strategies and policies are the basis of operational plans and framework for plans. Both gives direction and are closely related. The word strategy is derived from a Greek word “STRATEGOS” meaning General. Strategies is the determination of the basic long term objectives of an enterprise and the adoption of courses of action and allocation of resources necessary to achieve these goals policies are general statements or understandings that guide manager’s thinking and decision making.
3. PROCEDURE & RULES
Procedures are plans that establish a required method of handling future activities. Briefly, procedures guide actions. Rules are those required actions or non-actions allowing no discretion. Rules are simply called simple plans.
4. PROGRAMMS
Programs are a complex of goals, policies, procedures, rules, tasks and steps to
be
taken, resources to be employed and other elements necessary to carryout a given
course of action and normally supported by capital and operating budgets.
5. BUDGET
A budget is a numerized program. It is a statement of plans and expected results
expressed in numerical terms or forms. The budget of an enterprise represents
the
sum total of income and expenses with profit or surplus.
STEPS IN PLANNING
There are eight applicable steps in planning which should be followed by managers in connection with major programs and in any other through planning.
1. AWARENESS OF OPPERTUNITIES
An awareness of opportunities in the external environment as well as within the
organization is the real starting point for planning. All managers should take
look at
future opportunities and see them clearly and completely. They should know where
they stand in light of their strengths and weakness, understand what problems
they
wish to solve and why, and know what they expect to gain. Setting realistic
objectives
depends on this awareness.
(i) About market (ii) About expected competition (ii) What customers wants (iv) Awareness about their qualities and weakness
2. SETTING OBJECTIVES
The second step in planning is to establish or set objectives for the entire
enterprise
and then for each subordinate work unit. Objectives specify the expected results
and
indicate the end points of (i) What is to be done (ii) Where the primary
emphasis is to
be placed (iii) What is to be accomplished by the network of strategies,
policies,
procedures, rules, budgets and programs.
3. DEVELOPING PREMISES
The third logical step in planning is to establish planning premises. Such as
forecasts,
applicable basic policies and existing company plan. The are assumptions about
the
environment in which the plan is to be the carried out. It is important for all
the
managers involved in planning to agree on the premises.
Forecasting is important in premising: What kind of markets will be there? What
volume of sales? What prices? What products? What technical developments? What
cost? Etc
4. INDENTIFYING ALTERNATIVE COURSES OF ACTION
The forth step in planning is to search and examined alternative courses of
actions.
The planner must usually make preliminary examination alternative courses to
accomplish the goal.
5. EVALUATING ALTERNATIVE COURSES
After determining alternative courses and examining their strong and weak
points, the
next step is to evaluate the alternatives. That which alternative will give the
best of
meeting goals at the lowest cost and highest profit in a given period.
6. SELECTING A COURSE
Selecting an alternative is the real point of decision making. This is the point
at
which the plan is adopted. After identifying and evaluating alternative the
manager
has to decide one best alternative or several alternative courses of action.
7. FORMULATING DERIVATIVE PLANS
The seventh step in planning is formulating derivative plans. When a decision is
made
next step is to formulate a supporting plan, such as to buy equipment,
materials, hire
and train workers and develop a new product.
8. NUBERISING PLANS BY MAKING BUDGETS
After decision making and formulating plans the final step in planning is to numberise decision and plan by converting them into budgets. The overall budgets of an enterprise represent the sum total of income and expenses with resulting profit. Budgets are important thing in planning process.
STEPS IN PLANNING
Being aware of opportunity in the light of the market competition what costumer want our strength our weakness.
Settings objectives we want to be and what we want to accomplished and when
Considering planning premises in what environment external or internal will our plan operates.
Identifying alternatives what are the most promising alternatives to accomplishing to our objectives.
|
Comparing alternatives in
|
| Choosing and alternative selecting the course of action we will pursue. |
| Formulating supporting plans such as plans to buy equipment, buy materials, hire and train workers develop a new product. |
| Numberising plans by making budgets develops such budgets as; volume and price of sales. Operating expenses expenditures for capital equipment. |
THE PLANNING PROCESS
A rational approach to goal achievement planning is a rational approach to
accomplishing objectives. The process can be shown by figure.

Progress, time, critical planning, premises
In this diagram, progress (toward more sales, higher profits, lower costs, and so forth) is on the vertical axis, and time is on the horizontal axis. Here x indicates where we are (at to or time zero) and y where we want to be at future time (at tn). In short, we are at ax and want to go to y. often we do not have all the data, but we start planning anywhere. We may even have to start our planning study at x (at t-n). the line x y is the decision path. If the future work completely certain, the line x y would be relatively easy to draw. Because we cannot forecast or consider everything, we try to develop our path x to y in light of the most critical premises. The essential logic of planning applies regardless of time interval between TO and TN, weather it is five minutes or twenty years. If the time span is long, premises may be unclear, goals may be more difficult to achieve and other planning complexities may be great.
MANAGEMENT BY OBJECT (MBO)
Management by objectives (MBO) is now practiced all over the world. Yet, despite
its wide applications, it is not always clear what is meant by MBO. Some says
that it
is an appraisal tool; other sees it is a motivational technique; still others
consider
MBO a planning and control device. In other words, definitions and applications
of
MBO differ widely. MBO process consists of setting goals at the highest level of
the
organization, clarifying the rules of responsible persons for achieving the
goals. Some
still define MBO in a very narrow, limited way.
BENEFITS OF MBO
There are four benefits of MBO.
1. MBO IMPRVOES MANAGEMENT:
All the objectives of management by objective can be summarized by saying that
it
results in greatly improved Management. objective can not be establish without
planning.MBO force Managers to think about planning for results.MBO also
requires
that Managers think about the way from which they will accomplish results. They
will think about need of assistance to achieve the objectives.
2. MBO CLASSIFY ORGANIZATION
MBO classify the organizational roles and structure. It force managers to
delegate
authority according to the results they expect.
3. MBO INCOURAGE PERSONAL COMMITMENTS;
One of the great advantages of management by objective is that it encourages
people
to commit themselves to their goals. Because of MBO people can understand their
area of discretion, there authority, the part in setting their objectives.
4. MBO DEVLOPES EFFECTVE CONTROL
MBO help people to develop effective control. As MBO guides in setting result
oriented planning. It is also guides people to develop effective control towards
the
accomplishment of the goals.
WEAKNESSES OF MANAGEMENT BY OBJECTIVES
With all its advantages, MBO has a number of weaknesses. There are several
weakness of MBO.
1. MBO FALIURE TO EXPLIAN PHILOSPHY MBO
As MBO emphasis self-control and self direction therefore sometimes managers
fail
to explain the philosophy of MBO to their subordinates. Managers often fail to
explain about MBO that it is? How it works? Why it is being done? What part in
performance appraisal? How participants can benefits?
2. MBO FAILURE TO GIVE GUIDE LINES FOR GOAL SETTING
One of the weaknesses of MBO is that it fails to give guide line for goal
setting to
managers. Managers need planning premises and knowledge of major company
polices. People must have some assumptions about future. They should have some
understanding about objectives affecting their areas of operations. They should
know
about objectives and programes.MBO fails to give guideline to Managers.
3. DIFFICULTY OF SETING GOALS
Truly verifiable are difficult to set. MBO difficult and verifiable goals.
4. EMPHASIS ON SHORT TIMES GOALS
In most MBO programs, managers set goals for the short term for yearly or
quarterly.
Emphasis on short term goals lead to danger more expensiveness as of the longer
range.
5. DANGER OF INFLAXIBILITY
In MBO program managers often hesitate to change objectives. Change in objective
can affect results. So in MBO managers often hesitate to know flexibility.
OTHER WEAKNESSES
There are some other dangers and difficulties in MBO.
1- There may be a danger of overuse of quantitative goals or low gradation of
important goals.
2- Difficulty in applying goal oriented planning.
3- Difficulty of converting broad objective into subordinate objectives.
4- Difficulty in measuring performance.
5- Difficulty in providing feedback.
6- Difficulty in setting long-range objectives and planning.
7- Difficulty in adjusting to the fast changing environment
DECISION MAKING
Decision making is defined as the selection of course of action
from among
alternative. It is the core of planning. A plan cannot be said to exist unless a
decision
has been made.
Managers sometimes see decision making as their central job because they must
constantly choose what is to be done, who is to do it and when, where and how it
will
be done. Decision making is the part of planning and everyone’s daily living.
RATIONAL DECISION MAKING;
It is the rational decision making that goals cannot be attain without action.
People acting or deciding rationally are attempting to reach some goal that
cannot be
attained without action. They must have a clear understanding of alternatives.
Thy
must have ability and information to analyze and evaluate alternatives in order
to
achieve goals. Finally they must have desire to come the best solution by
selecting
alternative.
STEPS IN DECISION MAKING
There are three steps in decision making.
1- THE SEARCH FOR ALTERNATIVES.
The first steps of decision making are to develop alternatives. There are almost
always alternatives to any course of action. If we think of only one course of
action,
clearly we have not thought hard enough.
The ability to develop alternatives is often as important as being able to
select
correctly from among them. One of the other hand ingenuity research and common
sense will often unearth so many choices that all of them cannot be evaluated.
The
manager needs help in this situation, and this help can be solved by decision
making.
2- EVALUATION OF ALTERNATIVES.
When an appropriate alternative has been found, the next steps in planning one
best
alternative to achieve the goals. There are three ways of evaluated decision
making.
1- QUANTITIVE AND QUALITIVE FACTOR
Quantitative factor can be measured in numerical terms. This factor is vary
important
but the success of the venture would be endangered qualitative factors were
ignored.
Qualitative factor are those that are difficult to measure numerically such as
the
quality of labor relations, the risk of technological change etc.
2- MANAGERIAL ANALYSIS
In evaluating alternatives managerial analysis is very important. Marginal
analysis
can be used in comparing factors other then costs and revenue. For example to
find
the best output of a machine, inputs could be varied against outputs until the
additional input equals the additional output.
3- COST EFFECTIVENESS ANALYSIS
Cost effectiveness analysis seeks the best ratio of benefits and costs. For
example
finding the least costly way of reaching objectiveness is a technique for
choosing the
best plan.
SELECTING AN ALTERNATIVE
During the selection among the alternatives, managers can use three basic
approaches
(1) Experience (2) Experimentations (3) research and analysis.

Bases for selecting from among alternatives
EXPERIENCE
Reliance on past experience plays a larger part in decision making to some extent, experience is the best teacher. The very fact that managers have reached there position appears to justify their past decisions. Moreover, the process of thinking problems through making decisions and seeing programs succeed or fail.
EXPERIMENTATION
One way of deciding among alternatives is to try one of them and see what
happens.
Experimentation is often used in scientific theory. The experimental technique
can be
most expensive, especially if a program requires heavy expenditures firm cannot
afford to attempt several alternatives.
RESEARCH AND ANALYSIS
One of the most effective techniques for selecting from alternatives is research and analysis of decisions. This approach means solving problems by first comparing it. It is pencil and paper approach to decision making
OUTLINE NO.03 ORGANIZATION
Span of control
o Factors determining an effective span
Departmentalization
Types of departmentalization
o Departmentalization by numbers
o Departmentalization By time
o Departmentalization By function
o Departmentalization By geography
o Departmentalization By customer
o Departmentalization By process
o Departmentalization By product
Formal & Informal organization
Authority & power
Line and staff concepts
o Line authority
o Staff concept
Line and staff organization of a typical manufacturing company
o Nature of line & staff concepts
o Benefits of staff
o Weaknesses of staff
Delegation of authority
o Splintered authority
o Recovery of delegated authority
o The art of delegation of authority
Personal attitude toward delegation
Guidelines for overcoming weak delegation
ORGANIZATION
INTRODUCTION
Organization involves division of work among people whose efforts must be coordinate To achieve specific objectives and to implement pre-determined strategies.Organization is the foundation upon which the whole structure of management is built? It is the backbone of management. After the objectives of an enterprise are determined and the plan is Prepared, the next step in the management process is to organize the activities of the Enterprise to execute the plan and to attain the objectives of the enterprise. The term Organization is given a variety of interpretations. In any case, there are two broad ways in which the term is used. In the first sense, organization is understood as a dynamic process and a managerial activity which is necessary for bringing people together and tying them together in the pursuit of common objectives.
When used in the other sense, Organization refers to the structure of relationships among positions and jobs which is Built up for the realizations of common objectives. Without organizing managers cannot function as managers. Organization is concerned with the building, developing and maintaining of a structure of working relationships in order to accomplish the objectives of the enterprise. Organization means the determination and assignment of duties to People, and also the establishment and the maintenance of authority relationships among these grouped activities.
It is the structural framework within which the
various
efforts are coordinated and related to each other. Sound organization
contributes
greatly to the Continuity and success of the enterprise. The distinguished
industrialist
of America, Andrew Carnegie has shown his confidence in organization by stating
that: "Take away our factories, take away our trade, our avenues of
transportation, our
money, leave nothing but our organization, and in four years we shall have re-established ourselves." That shows the significance of managerial skills and
organization. However, good organization structure does not by itself produce
good
performance. But a poor organization structure makes good performance
impossible,
no matter how good the individual may be.
The term 'Organization' connotes different things to different people. Many
writers
have attempted to state the nature, characteristics and principles of
organization in their own way. It can be used as a group of persons working
together or as a structure
of relationships or as a process of management. Now, let us analyze some of the
important definition of organizing or organization, and understand the meaning
of
organization.
ACCORDING TO SHELDON
"Organization is the process of so combining the work which individuals or groups have to perform with facilities necessary for its execution, that the duties so performed provide the best channels for efficient, systematic, positive and coordinated application of available effort." In the words of Chester I Bernard, "Organization is a system of co-operative activities of two or more persons."
MC FERLAND HAS DEFINED
Organisation as, "an identifiable group of people contributing their efforts
towards the
attainment of goals".
ACCORDING TO LOUIS A ALLEN,
"Organisation is the process of identifying and grouping the work to be
performed,
defining and delegating responsibility and authority, and establishing
Relationships
for the purpose of enabling people to work most effectively together in
accomplishing
objectives.
ACCORDING TO NORTH WHITEHEAD
Organisation is the adjustment of diverse elements, so that their mutual
relationship
may exhibit more pre-determined quality.
IN THE WORDS OF THEO HAIMANN
Organizing is the process of defining and grouping the activities of the
enterprise and
establishing the authority relationships among them. In performing the
organizing
function, the manager defines, departmentalizes and assigns activities so that
they can
be most effectively executed.
IN THE WORDS OF MOONEY AND RAILEY,
"Organisation is the form of every human association for the attainment of a
common
purpose.”
ACCORDING TO JOHN M PFIFFNER AND FRANK P SHERWOOD,
"Organisation is the pattern of ways in which large number of people, too many
to
have intimate face-to-face contact with all others, and engaged in a complexity
of
tasks, relate themselves to each other in the conscious, systematic
establishment and
accomplishment of mutually agreed purposes.”
SPAN OF CONTROL
(1) Span of control refers to the number of immediate subordinate who report a
manager.
(2) Different level of organization level is also called span of control.
FACTORS DETERMINING AN EFFECTIVE SPAN
There are several factors which influence the span of management.
1- TRAINING OF SUBORDINATES
The better training of subordinates increases the necessary superior
subordinate’s
relationship. Well trained subordinates require less time of their managers also
they
have less contact with their managers. Training programs increase in new and
more
complex industries.
2-CLARITY OF DELEGATION OF AUTHORITY
Although training enables managers to reduce the frequency of time consuming
contact but delegation of authority should be clear. If a manager clearly
delegates
authority to task with a minimum of the managers time and attention. But if a
manager delegate’s authority unclearly than subordinate give his maximum.
3-CLARITY OF PLANS
If plans are well defined if they are workable, if the delegation of authority
toward
plan is clear, if the subordinate understands what expected than little of a
supervisor
time will be required on the other hand if plan cannot be drawn accurately and
subordinates do much of their own planning, they may require considerable
guidance.
4- USE OF OBJECTIVE STANDARD
A manager must find out, either by personal observation or through the use of
objective standards, whether subordinates are following plans. Obviously, good
objective standards enable managers to avoid many time consuming contact.
5- RATE OF CHANGE
Certain enter rises change much more rapidly than others. The rate of change is
very
important in formulating and maintaining policies. It may explain the
organization
structure of company’s railroad, banking and public utility companies.
6- COMMUNICATION TECNIQUES
Communication techniques also influence the span of management. If every plan,
instruction, order or direction has to be communicated by personal contact than
managers time will be heavily burdened. An ability to communicate plans and
instructions clearly and concisely also tends to increase a managers span.
7- AMOUNT OF PERSONAL CONTACT NEEDED
Many instances, face to face meetings are necessary. Many situations cannot be
completely policy statements planning documents or other communications that do
not involves personal contact. An executive may and valuable information’s by
meeting to subordinates and by discuss problems with them. Some problems can be
handled only in face to face meeting so the best way of communicating problems,
instructor, and subordinates is to spend time in personal contact.
8- VARIATION BY ORGANIZATION LEVEL
Several research projects have found that the size of the most effective span
differs by
organizational level. For example, it was studied that when a greater number of
specialties were supervised, effective spans were narrower at lower and middle
levels
of organization but were increased at upper levels.
9- COMPETENCY OF MANAGERS
A manager who is competent and well trained can effectively supervise more
people
than who is not.
10- MATURITY AND MOTIVATION OF SUBORDINATES
The more mature subordinates may delegate more authority, thus widening the
span.
TABLE: - FACTORS INFLUENCING THE SPAN OF CONTROL
| NARROW SPAN RELATED TO: | WIDE SPAN RELATED TO: |
| 1-little or no training. 2-unclear authority, delegation. 3-nonverefiyable objectives & standard. 4-fast changes in external and internal environment. 5-use of communication techniques. 6-ineffectiv interrogation of superior and subordinate 7-greater number of specialization at lower and Middle level. 8-Infactive meetings. 9-Incompletent & untrained managers. 10-Complex task. 11-Imature subordinate. |
1-through training of subordinate. 2-Clear delegation of authority. 3-Will define plans. 4-Slow changes in external and eternal Environment .5-use of appropriate techniques such as written, oral communication. 6effetive interaction between superior & superior 7-Number of specialist at upper levels. 8-Effective meetings. 9-Competent & train managers. 10-Simple task. 11-mature subordinates. |
DEPARTMENTATION:
Departmentation is process of grouping activities and people onto department
make it
possible to expend organization. After reviewing the plan, usually the first
step in the
organization process is departmentalization. Once job have been classified
through
work specialization, they are grouped so those common tasks can be
coordinated. Departmentalization is the biases on which work or individuals are
grouped into manageable units. There are five traditional methods for grouping
work
activities.
Thus workflow analysis can be used tighten the connection between employees’
work
and customers needs. Also it can help to make major performance breakthroughs
throughout business process reengineering (BPR).A functional rethinking and
radical redesign of business process to achieve dramatic improvements in costs,
quality, service, and speed.BPR use workflow analysis to identify jobs that can
be
eliminated or recombined to improve company.
TYPE OF DEPARTMENTATION:
1-DEPARTMENTATION BY NUMBERS:
Dpartmentation by number is telling off persons who are to perform the same
duties
and putting them under the superior of a manager the essential fact is not what
these
people do, where they work? Or what they work with, it is that the success of
the understanding depends only on the number of persons include in
it. This method is
rapidly applying in army.
DISADVANTAGES OR DECLINES REASONS;
There are many reason of decline of departmentation by numbers.
1-It has declined due to advance technology and demand of specialized and
different
skills.
2-A second reason is groups composed of specialized personnel are more efficient
then those based on number.
3-Departmentation by number is useful only at the lowest level of the
organization.
4-Departation by number fails to produce good results
2-DEPARTMENTATION BY TIME
It is grouping activities on the basis of time. It is oldest form of
departmentation and
it is generally used in low level of departmentation. It is particularly applied
in
hospitals and steel manufacturing enterprise where continue process of service
and
manufacturing is used.
ADVANTAGES
1- It is process of working and services throughout 24 hours.
2- It is continuing service process.
3- Expensive machinery is used in shifts.
4- Students can work evening or at night.
DISADVANTAGES
1- There is lacking supervision at night.
2- Exhaustion factor.
3- DEPARTMENTATION BY FUNCTION
It is grouping activities on the basis on function of an enterprise. The basic
enterprise
functions are production, selling, and financing functional departmentation is
bases
for organizing activities and in organizational structure. It organizes by
function to be
performed. The function reflects the nature of the business. The advantage of
this
type of grouping is obtaining efficiencies from consoliding similar specialties
and people with common skills, knowledge and orientations together
in common units.
ADVANTAGES
1- It is logical reflection of function.
2- Maintains power of major functions.
3- Simplifies training.
DISADVANTAGES
1- De-emphasis of overall company objectives.
2- Reduces coordination between function.
3- Slow adoption to change in environment.
4- DEPARTMENTATION BY GEOGRAPHY
Departmentation by geography is followed where geographic marked appear to offer
advantages. Geographic department most often use in sales and production, it is
not
use in finance. Departmentalization by geographical regions groups jobs on the
basis
of territory or geography. For example merek, a major pharmaceutical company,
have
its domestic sales departmentalized by regions such as Northeast, Southeast, &
Northwest
ORGANIZING CHART
| President | ||
| Manager southern region | Manager central region | Manager north region |
ADVANTAGES
1- It emphasis on local markets and problems.
2- Improves coordination in a region.
3- Better face to face communication.
DISADVANTAGES
1- Increases problem of top management control.
2- Requires more persons with general manager abilities.
5. DEPARTMENTATION BY CUSTOMER
Departmentalization by customer groups jobs on the basis of a common set of needs or problems of specific customers. For instance, a plumbing firm may group its work according to whether it is serving private sector, public sector, government, or notfor-profit organizations. A current departmentalization trend is to structure work according to customer, using cross-functional teams. This group is chosen from different functions to work together across various departments to interdependently create new products or services. For example, a cross-functional team consisting of managers from accounting, finance and marketing is created to prepare a technology plan.
ORGANIZING CHART
| Executive Manger | |||
| Manager Business loans | Manager students loans | Manager Personal loans | Manager Army loans |
There is different difficult decision to be made in separating some type of
customer
departments from product departments. Business owners and managers arrange
activities on the basis of customer requirements. Departmentation by customer
can be
defined by figure
ADVANTAGES
1- Departmentation by customer emphasis on customer needs.
2- It develops experience in customer area.
DISADVANTAGES
1- It may be difficult to analysis customer demands.
2- It requires managers and staff expert in customer problems.
3- Customer groups may not always be clearly defined.
6- DEPARTMENTATION BY PROCESS
This type of departmentation is found in production and operative levels. Such type of departmentation can be found in paint or electroplating process. Departmentalization by process groups jobs on the basis of product or customer flow. Each process requires particular skills and offers a basis for homogeneous categorizing of work activities. A patient preparing for an operation would first engage in preliminary diagnostic tests, and then go through the admitting process, undergo a procedure in surgery, receiver post operative care, be discharged and perhaps receive out-patient attention. These services are each administered by different departments.
PRESIDENT
Manager Purchases Manager Finance Manager Production Manager Sales
Dept by process Heat treatment welding section Assembling section finishing section
ADVANTAGES
1- It simplifies training.
2- Achieve economic advantage.
3- Uses specialized technology.
DISADVANTAGES
1- Coordination of departments is difficult.
2- Responsibility for profit is at the top.
7- DEPARTMENTATION BY PRODUCT
This type of departmentation used in organization where more than one product is
producing. In this department all the sources and authority are placed under the
control of one manager.Departmentlization by product assembles all functions
needed
to make and market a particular product are placed under one executive. For
instance,
major department stores are structured around product groups such as home
accessories, appliances woman’s clothing, men’s clothing and children clothing.

ADVANDTAGES
1- Places attention on production.
2- Increase growth of product.
3- Places responsibility for profit at division level.
DISADVANTAGES
1- Requires more persons with general manager abilities.
2- Presents problems of top management control.

Formal and Informal Organization
FORMAL ORGANIZATION
Formal organization means the intentional structure of rods informally organized enterprise. Formal organization must be flexible. Formal organization does not mean that there is anything inflexible. If a manager is to organize well, the structure must furnish an environment in which individual performance, both present and future contributes most effectively to group goals.
INFORMAL ORGANIZATION
Informal organizational is define by different authors one says, Informal organization is any joint personal activity without conscious joint purpose, even though contributing to joint results. Thus informal relation ships established in the group of people playing chess during lunch time may aid in the achievement of organization goals. It is much easier to ask for help on an organization problem from someone you know personally, even if he or she may be in different departments than from some one you know only as a name on an organization chart. Another author describes informal organization as a network of personal and social relationships not required by the formal organization but arising spontaneously as people but associate with one another.
AUTHORITY & POWER
Power is much broader concept than authority power is the ability of individuals or groups to informal the actions of other persons or groups.
AUTHORITY
Authority is the legal right to command actions by others and to enforce compliance. Authority may also be defined as the degree of discretion in organizational position conferring on persons occupying these positions the right to use their judgment in decision making.
TOP TO DOWN AUTHORITY
Share holder
Board of director
Chief Executive
Managers
Supervisors
Worker
POWER
Power is border concept then authority. I may be defined as a strong influence
on
direction on individuals is behaviors power may also define as the ability of
individuals or groups to influence the action of other persons. There are five
bases /
sources or kind of power.
1- LEGITIMATE POWE
The official position of a person is an organization is known as legitimate
power . for
example, a major in army has power over Captain and subordinate.
2- COERCIVE POWER
A person’s ability to create fear in other individuals and is based on
subordinates
expectation that punishment will be received for not completing work. It is
closely
related to reward power and normally arising from legitimate.
3- REWARD POWER
Power arises from ability of some people to grant reward reward is known as
reward
power. University Professors have considerable reward. power they made high
grade.
4- EXPERT POWER
Power may also come from the expertness of a person or a group. This power of
knowledge. Physician lowers, &university professors may have considerable
influence for their special knowledge.
5- REFERENT POWER
This is the power of admiring high esteemed leader by individuals.
6- DECESION MAKING POWER
This power arises from the power of positions. When people speak pf authority in
managerial setting, they are usually referring to the decision making power.
LINE & STAFF CONCEPT
LINE AUTHORITY
Line authority gives a superior a line of authority over subordinates. It exists
in all
organizations. Line authority can also be defined as the superior – subordinate
authority relationship where by a superior makes decision and tells them to a
subordinate who is turn makes decision and tells to his subordinates and on from
a
line from top to low level of organization structure. This line of authority is
known as
line of authority. It is directly from superior to his subordinate.
LINE AUTHORITY chain of command
President
Voice President
Supervisor
Employee
STAFF CONCEPT
The nature of the staff relationship is advisory. The function of people in pure
staff
capacity is to investigate research and give advice to line managers. In other
words,
staff functions are those that help the line persons work more effectively in
accomplishing the objectives.

LINE & STAFF ORGANIZATION OF A TYPICAL
MANUFACTURING COMPANY
NATURE OF LINE & STAFF CONCEPT
Line authority gives a superior a line of a authority over a subordinate. Line
authority
is that relationship in which superior exercises direct supervision over a
subordinate.
On the other hand the nature of the staff relationship is advisory. The function
of a
person in staff capacity is to investigate research and give advice to line
manager.
BENEFITS OF STAFF
1. Provide highly specialized knowledge indifferent areas, i-e- economics,
technical, legal etc.
2. Specialist staff avails lines to analysis collected data and make advice
for
managers.
3. Staff analysis and advices help in resolving problems arrised during process
WEAKNESSES OF STAFF
1. Danger of understanding line authority.
2. Lake of staff responsibility.
3. Thinking in a vacuum
4. Managerial problems.
DELEGATION OF AUTHORITY
Delegation is necessary for an organization to exist. Authority is delegated
when a
superior gives a subordinate discretion to make decision. Clearly , supervisors
cannot
delegate authority they do not have ,whether they are board members, Presidents,
Voice Presidents or superiors.
The process of delegation involves.
1. Determining the results expected from a position.
2. Assigning tasks to the positions.
3. Delegating authority to accomplishment of the tasks.
4. Holding the persons in that position responsible for the accomplishing meat
of
the tasks.
5. Authority is delegate from higher level to lower level.
STEPS IN DELEGATING
SPLINTERERD AUTHORITY
Splintered authority exits whenever a problem cannot solve. In day to day
operations
of any company. There are many cases of splintered authority. Many Managerial
Conferences are held because of the necessity of splintered authority to make
decisions.
RECOVERY OF DELEATED AUTHORITY
A manager who delegates authority does not permanently dispose of it , delegated
authority can always be regained. Re organization involves reorganization,
rights are
recovered by the responsible head of the firm or a departments, to head of a new
department may receive authority formally held by other Managers.
THE ART OF DELEGATIONOF AUTHORITY
The most failure in effective delegation occurs not because Manager does not
understand the nature and principles of delegation because they are unable to
apply
them. There are many reasons for poor delegation.
PERSONAL ATTITUDE TOWARD DELEGATION
There are many kinds of personal attitudes which cause poor delegation of
authority
so Managers should fallow these steps.
1- RESPECTIVENESS
Decision making always involves some discretion and a subordinates decision is
not likely to be exactly the one superior would have made the manager who
known how to delegate must be able to help other and to compliment on their
ingenuity.
2- WILLINGNESS TO LET GO
A manager who will effectively delegate authority must be willing to release the
right
to make decisions to subordinates. A major fault of some managers is that they
want
to continue to make decisions for the positions they have left. Corporate
president and
vice presidents who insist on confirming every purchase do not realize that
doing so
takes their time and attention away from more important decisions.
3- WILLINGNESS TO LET OTHER MAKE MISTAKES
Since every one makes mistakes, a subordinate must be allowed to make some, and
their cost must be considered an investment in personal development serious or
repeated mistakes can be largely avoided without multifying delegation.
4- WILLINGNESS TO TRUST SUBORDINATES
Superiors have no alternative to trusting their subordinates; for delegation
implies a
trustful attitude among them. A superior may put off delegation will the thought
that
subordinates have not yet experienced enough, they cannot handle people, they
have
not developed Judgment etc. Sometimes these considerations are true but then a
superior or should either train subordinates or else select others who are
prepared to
assume the responsibility.
5- WILLINGNESS TO ESTABLISH AND USE BROAD CONTROLS
Superiors should not delegate authority unless they are willing to find means of
getting feed back. Obviously, controls cannot goals, policies and plans are used
as
basic standard for judging the activities of subordinates.
GUIDES FOR OVERCOMING WEAK DELEGATION
The following guide can overcome weak delegation.
1- Define assignments and delegate authority in the light of results
expected.
2- Select the person in light of the job to be done.
3- Maintain open lines of communication.
4- Establish proper control.
5- Reward effective delegation and successful assumption of authority.
OUTLINE NO STAFFING: 04
1. What is Staffing?
2. Define the nature and task of the manager
3. Defining the managerial job
4. The system approach to human resource management
a. Aspects in the system approach to staffing
i. Factors affecting the number and kinds of manager required
ii. Determination of available managerial resources
iii. Analysis of the need for managers
iv. Other important aspects
5. Purpose and objectives of staffing
a. Situational factors affecting staffing
i. External factors
ii. Internal factors
6. The selection process
a. Definition
b. The selection process
c. Interviews
d. Tests
e. Assessment centers
f. Limitation of the selection process
7. Steps/process/principles of staffing
a. Principle of job definition
b. Principle of managerial appraisal
c. Principle of open competition
d. Principle of management training and development
e. Principle of management objectives
f. Principle of continuing development
STAFFING
What is staffing?
Staffing is define as
“Filling and keeping filed, positions in the organization structure”
This process is done by ten concepts.
1. Identifying the work force requirements.
2. Inventorying the people available.
3. Recruiting
4. Selecting candidates.
5. Planning candidates.
6. Promoting candidate.
7. Appraising candidates.
8. Planning careers of candidates.
9. Training candidate.
10. Developing and compensating candidates and current jobholders.
DEFINING THE MANAGERIAL JOB
There is no agreed definition of managerial job of a manager. There are
several
different definition of managerial job by different writers.
One group of writers studied successful managers and described their behaviors
and
habits. Although the stories about these people are interesting but authors do
not
provide a theory to explain the success of these successful managers. Other
writers
focus on profit maximization, innovation, risk taking and similar activities.
Yet
another group of writers emphasizes decisions that cannot be easily programmed.
Managerial job also define as leadership having power and influence over the
environment and subordinates. One says, managerial job is process of observing
the
activities of managers. However the key tasks of managers are planning,
organizing
staffing, leading, and controlling.
THE SYSTEM APPROCH TO HUMAN RESOURCE MANAGEMENT
Figure shows the managerial function of staffing relates to the total
management. in
system approach to staffing enterprise plan or organization plane become
important
inputs for staffing tasks. The organization structure determines required
numbers and
kinds of managers. These demands for managers are compared with the available
talents through management inventory.

On the basis of this analysis, external and internal resources are utilized
in the process
of recruitment, selection, placement, promotion and sepration.Other aspects of
staffing are appraisal, career strategy and training and development of
managers.
Staffing effects leading and controlling. Well trained managers create an
environment
in which people working together in the organization setup can achieve
enterprise
objectives and accomplish personal goals.
Staffing requires an open system approach. It is carried out within the
enterprise
which is linked to the external environment. Therefore it cannot be carried out
within
the enterprise which is linked to the internal environment.
ASPECTS IN THE SYSTEM APPROCH TO STAFFING
In system approach to human resource management or staffing the fowling aspects
are to considered.
1. FACTORS AFFECTING THE NUMBER & KINDS OF MANAGER
REQUIRED
The number of managers needed in an enterprise depends on (1) Size of business
(2)
plans of expansion (3) Rate of turnover of managers (4) Complexity of
organization
structure.
2. DETERMINATION OF AVAILABLE MANAGERIAL RESOURCS
It is also known as management inventory. It is common for any business and non
business enterprises, to keep an inventory of new materials and goods on hand to
enable it to carry on its operations.
3. ANALYSIS THE NEED FOR MANAGERS.
Analysis of the need for managers depends upon internal resources.
INTERNAL RESOURCES
1. Plane for growth.
2. Replacement or out replacement staff.
3. demotions
4. Early retirement.
5. External factors.
6. Internal factors.
7. External factor include
ETERNAL RESOURCES
1. Economic factor.
2. Technological factors.
3. Social factors.
4. Political factors.
5. Legal factors.
4. OTHER IMPORTANT ASPECTS
After the need for managerial personnel a number of candidates may have to be.
1. Recruited
2. selected
3. place
4. promote
THERE ARE MANY OBJECTIVES & PURPOSES
OBJECTIVES OF STAFFING
The objective and purpose of managerial staffing is to ensure that
organizational
positions are filled by the qualified personnel, who are able to willing to
occupy them.
2ndly, the purpose / objective of managerial staffing is to define job,
performance
appraisal training and development of people
3rdly, the purpose / objective of managerial staffing is to matching the
persons with
job, identifying job requirement, job, design etc.
SITUATIONAL FACTORS AFFECTING STAFFING
The actual process of staffing is affected by many environmental factors. For
example
external and internal factors.
EXTERNAL FACTORS
Factors in external environment do affect staffing to various degrees. These
influences can be grouped into educational, social cultural, legal political and
economic opportunities. External factors include.
1. Well trained managers.
2. Well educated managers.
3. Highly skilled managers.
Ignorance of external factors may keep away an enterprise from growing at
design
rate
INTERNAL FACTORS
Internal factors include
1. Personal policies.
2. Organizational climate.
3. Reward system.
Internal factors of staffing are required to be taking consideration.
THE SELECTION PROCESS
Selection is the process of choosing from among the candidates, from within the
organization or from the outside organization the most suitable person for the
current
position or for future positions.
THE SELECTION PROCESS
There are many steps in the selection process, for example, the interview of a
candidate, tests, assessment centers etc. There are some variations in the steps
of
selection process For example the interview of candidate for a first level
supervisory
position may be relatively simple then interviews for a top level executive. In
the
selection process firstly, the selection criteria are established in the basis
of current
and future job requirements. These criteria include.
1. Education, knowledge, skills and experience.
2. The candidate is requested to complete the application form.
3. A screening interview is conducted.
4. Candidates are tested for additional information.
5. Formal interviews conducted on the basis of test.
6. Information provided by candidates are checked and verified.
7. Physical fitness is examined.
8. On the basis of previous step the candidate is offered job or information
about
that he/she has not been selected for the position. Lets determine some parts of
selection process.
INTERVIEW
In a structured interview the Manager ask a set of prepared questions, such as
the
following.
1. What were your specific duties and responsibilities in your last job?
2. What did you achieve in that job?
3. Who could be asked to verify these achievements?
4. Who are they?
5. What did you like or dislike about your job?
6. Why do you want to change your job?
TESTS
The primary aim of test is to obtain data about the applicants. Some of the
benefits
from testing include finding the best person for the job obtaining a high degree
of job
satisfaction for the applicant, and reducing turnover. The most commonly used
tests
can be classified as follows.
1. INTELEGENCE TEST
Intelligence test are design to measure mental capacity, to test memory , speed
of
thought and ability to see relationship in complex problem situations.
2. PROFICIENCY TEST
It constructed to discover interest, existing skills and potential for acquiring
skills.
3. VOCATIONAL TESTS
Vocational test are designed to show a candidates most suitable occupation.
4. PERSONALITY TESTS
Personality tests are designed to show or discover candidate’s personal
characteristics.
ASSESSMENT CENTERS
The assessment center is not a location but a technique for selecting and
promoting
managers. This approach may be used in training assessment centers were first
used
for selecting and promoting lower level but now they are applied to middle level
managers as well.
LIMITATION OF SELECTION PROCESS
There are many limitation of the selection process.
1. There is no one perfect way to select managers.
2. There is distinction between what person can do,
3. Testing process and especially psychological testing is limited.
4. Time and cost involved in making personnel decisions. It is important to
identify such factor as advertising expenses, agency fees, cost of test
materials, time spent interviewing candidate, costs for reference check etc.
When recruiting costs are recognized it becomes evident that turnover can be
very expensive to an enterprise.
STEPS/PROCESS/PRINCIPLES OF STAFFING
There are six steps/process or principles of staffing.
1. Principle of job definition
2. principle of managerial appraisal
3. Principle of open competition.
4. Principle of management training & development.
5. Principle of training objectives.
6. Principle of continuing development.
1. PRINCIPLES OF JOB DENIATION
The more precisely the results expected of managers are identified the
dimensions of
their positions can be defined.
2. PRINCIPLE OF MANAGERIAL APPRASIAL
The more clearly verifiable objectives and required managerial activities are
identified.
3. PRINCIPLE OF OPEN COMPETETION
The enterprise encourages open completion among all candidates for management
positions. Open competition shows the quality management. Open competition
better
candidate can be brought in the organization.
4. PRINCIPLES OF MANAGEMENT TARINING & DEVELOPMENT
Training and develop efforts are related to managerial function. Management
training
and development Leeds to the effective developed programs and activity of an
enterprise.
5. PRINCIPLES OF TRAINING OBJECTIVES
The principle of training objectives gives direction to development and
facilitates the
measurement of the effectiveness of training efforts.
This principle suggest that in a fast changing and competitive environment,
manages
cannot stop learning. Instead they have to update their managerial knowledge
continually and improve their managerial skills and performance to achieve
enterprise
result.